A detailed design project for flood levee remediation works. The structure is a part of the Clarence flood protection works, and consists of a levee, waterway bank and drainage structures which has been experiencing erosion at the toe of the riverbank, oversteepening of banks, loss of vegetation cover, illegal structures and moderate deterioration. Tasks include site inspections, ground investigation, geotechnical analysis, concept design, option appraisal, engineering design, geotechnical modelling, drafting, costing, documentation and For Construction design plans.