JBPacific undertook new hydrology and flood modelling, risk assessments, trigger level assessments, and software development to create a new flood forecasting and warning system for the Byron region, NSW. This Flood Early Warning System included configuration to live gauges, multiple forecast rainfall, tide and soil moisture datasets, a simulation library of flood hazards, and configuration within the Guardian Incident Management System (IMS).